Operations
Pool opening & closing season — the checklists your techs need to hit 40 accounts a week
July 26, 2026 7 min read·Service Pro Suite Team
#Ops
⚙
Pool opening & closing season — the checklists your techs need to hit 40 accounts a week
# Pool opening & closing checklists that scale
Season transitions are the two most-dangerous weeks of a pool service
year. In April, one bad opening can turn a happy 5-year customer into
an angry review. In October, one skipped step can freeze-crack a line
and kick off a 6-month warranty dispute.
Here's the tech-facing checklist that keeps 40+ accounts/week moving
during transitions.
## SPRING OPENING (April/May)
### Before you arrive
- Confirm the customer has already removed the cover (if applicable)
- Confirm any freeze damage they've noticed
### On-site — 60 to 90 minutes per pool
1. Remove cover, clean + fold + store
2. Reinstall skimmer basket, return jets, ladder, handrails
3. Reconnect chlorinator + salt cell
4. Prime pump, verify no leaks at fittings after 5 minutes running
5. Verify filter pressure gauge working, backwash if needed
6. Test water: pH, TA, CYA, calcium hardness, chlorine
7. Add shock (10 ppm free chlorine target)
8. Add stabilizer if CYA under 30 ppm
9. Balance pH to 7.4-7.6 with muriatic acid or soda ash
10. Photo: pump running, water clear, all equipment reinstalled
11. Note any equipment concerns for follow-up quote (motor bearings
noisy, DE filter grid degraded, heater not firing, etc.)
### Back at the truck
- Mark job complete in Service Pro Suite
- Auto-invoice fires with itemized chemicals
- Any equipment concerns get logged as separate Estimates for follow-up
## FALL CLOSING (October/November)
### Before you arrive
- Confirm the customer has already lowered water 6-8 inches below the
skimmer (or plan to do it on-site)
### On-site — 90 to 120 minutes per pool
1. Lower water 6" below skimmer + 2" below returns
2. Backwash filter completely, DE filter: rinse grids, sand: drain
3. Blow out all lines with a shop vac or pool blower (**this is the
one step nobody can skip — this is what prevents freeze cracks**)
4. Add pool antifreeze to skimmer + return lines to catch residual
5. Plug returns + skimmer with expansion plugs
6. Winterize the salt cell (remove + store indoors)
7. Winterize heater per manufacturer procedure (drain, blow out)
8. Add closing chemicals: pH neutral, shock to 5-10 ppm, algaecide,
metal sequestrant if needed
9. Install cover, secure
10. Photo: cover on, all equipment stored + labeled
11. Log: which plugs installed where (skimmer count, return count),
heater state, salt cell serial + where stored
### Back at the truck
- Cover job Complete → auto-invoice
- Set the property's next spring opening date on the recurring schedule
- Store closing photos on the property record — freeze-damage disputes
in January get resolved by pulling the closing photos.
## Why this matters
- **Skipped blow-out**: cracked line = $600-2,400 repair, disputed
- **Missed heater winterize**: cracked heat exchanger = $1,800-3,500
- **No closing photo**: no defense against dispute
## In Service Pro Suite
Set opening + closing as **service presets** with sub-tasks the tech
checks off in the mobile app. No sub-task = no job completion allowed.
Force the checklist to be followed. Techs will grumble the first week.
By week three they'll thank you for having their back on the season
transitions.